Handle concurrent RFQs without routing every proposal through the same senior engineer
Create capacity for concurrent RFQs while the responsible engineer keeps final approval.
Data + Rules + Assembly
The responsible engineer reviews and approves each proposal.
The situation
Picture a system integrator spending days on each technical proposal. Sales engineers pull specifications from product sheets, calculate costs in a private spreadsheet, and format a document by hand each time. When two RFQs arrive the same week, one waits. When the lead engineer is travelling, quotes stall.
What we would build
An intake form captures the project variables. Cifral applies the pricing logic and assembles the review-ready proposal in the company's own document template. The responsible engineer receives a notification when the draft is ready for review.
What changes
Manual document assembly is less likely to become the bottleneck when several RFQs arrive. Senior engineers can focus on technical decisions while retaining final approval.